Home  |  About the Company  |  Project Portfolio  |  Experience and Capabilities  |  Testimonials  |  Career Opportunities  |  Contact Us

290’ Dredge General MacArthur | 24” Dustpan Dredge | McDermott DB 30 Upgrade | 30” Suction Cutterhead Dredge | HOS M/V Freedom Service

M/V Epic Explorer | HOS M/V Saylor | HOS M/V Mystique | L/B 250 Lynette Pipe Lay Barge | M/V Ebanks Tide | 688-TEU Coastal Containership Design

M/V Ebanks Tide

Conversion of the 220’ OSV M/V Ebanks Tide into an offshore cable spooling vessel for Tidewater Inc. The conversion included all design, engineering and drafting for the installation of an elevated winch platform, storage reel and winch foundations along with a stern roller, shark jaws, tow pins and below-deck anchor chain storage. DEC also handled all ABS submittals and approvals.

Downey Engineering Corporation
One Galleria Boulevard, Suite 907
Metairie, Louisiana 70001
Phone: 504.818.0377  Fax: 504.818.0447
Louisiana Registered Engineering Firm C-1909

Web Design by Surfing Gator